INSTALLACTION OF SOLCOMAT™
- Slope preparation
Prepare the soil compaction, and make the soil surface as smooth as possible.
- Carrying in / Temporary Storage
Carry in SOLCOMATTM at the field site, and then disperse them so that further placement
can be performed easily.
- Installation work
Lift SOLCOMATTM up with heavy equipment and lay them in planned place.
- Connection
SOLCOMATTM can be interlocked with one another vertically or horizontally by attaching the block part of SOLCOMATTM on top of another at the unused extra portion of filter cloth's edge.
- Cover Soil
Put soil through the opening of the blocks until it reaches at about 80% height of the blocks.
- Sowing Seeds
Sow best seeds suited to the site.
TOP
|